Proposed Development
By recycling an old mine site we are able
to reuse some of the existing infrastructure, which allows
us to deliver electricity to BC Hydro more economically.
The
Princeton Power Project would utilize a very small portion
of the former Similco Mine Site. The Similco Mine Site
is approximately 18,000 acres in size, and Compliance would
be utilizing approximately 0.3% or 50 acres for the development. The
Project would supply a net 49 MW into the BC Hydro transmission
system and would utilize some of the existing infrastructure
that is currently at the site. The Project would
be built with a new state of the art emission control system
that will ensure that the plant will meet or better all provincial
standards for air emissions. |
 |

Former
Similco Copper Mine Site
|