Compliance Energy Corporation

Corporate PresentationSedar FilingsStock Quote

CorporateProjectsNewsInvestor RelationsFinancialsTSX.V-CEC
Basin Coal Raven Coal Project Bear Coal Project Power Generation Coalbed Methane
Basin Coal Project


2006 Exploration Program

Compliance completed a $2.1 million exploration program consisting of geological seismic surveys and development drilling to confirm coal continuity and structure.  As part of the 2006 exploration program a bulk sample was completed from one of the old adits that was located.  Results of this bulk sample were inconclusive and the Company was not able to replicate prior washability and carbonization tests.  Washability results from the 2006 drill core did verify previous drillhole washability results producing a yield of 40 to 45% for a metallurgical coal product of 8.5% ash.  Additional work is needed in this area and will be incorporated in future exploration programs.

 
 
Area of exploration focus for the 2006 exploration program
 
 
Eric Beresford, Director standing beside 3.5 meter coal seam at adit #1 during the 2006 exploration program.
 
© Compliance Energy Corporation